After the no

Our project was rejected. What now?

Hardly any project is approved on the first try, and that's no sign the idea is bad. The evaluation report is the most valuable thing you'll be given this year, and almost nobody uses it.

The short answer

First things first: check whether you've been rejected or put on the reserve list, because they're not the same — on the reserve list, the project passed the quality cut and was left out for budget reasons. Then read the report looking for which specific criterion it fell on: there are two thresholds, the overall total and half of the maximum in each criterion, and missing the second one is fixed in a different way from missing the first. If the problem was one of procedure, you can file a complaint; if it was the score, you can't. And the thing that pays off most: rewrite and apply again in the next round.

The email arrives, it says no, and the usual reaction in a small organisation is a mix of embarrassment and “I knew this wasn't for the likes of us”. It's the most expensive reaction there is, because it throws away the only valuable thing you've just been given.

An Erasmus+ evaluation report is an external, free, written analysis of your project, done by people who have read hundreds of them. No consultancy would give you that for less than it costs to write the application.

First things first: rejected or on the reserve list?

They're not the same, and the letter tells you which, although sometimes in the small print. According to the Guide, after the evaluation the selected applications receive an invitation to prepare the grant, and the rest are rejected or put on a reserve list.

Reserve list means the project passed the quality cut. It was left out because the final decision is based on two things: the committee's ranking and the budget available for the action. If one of the selected projects drops out, yours can get in.

That completely changes what you do next. A project on the reserve list doesn't need rewriting: it needs to be submitted again, perhaps with minor tweaks. One rejected on its score does need work.

How to really read the report

Don't read it from top to bottom looking for kind words. Look for one specific thing: which criterion has the low score. Because there are two thresholds, not one, and failing each of them means different things.

In the mobility actions, the evaluation splits 100 points across three criteria — relevance, rationale and impact (30), quality of project design and implementation (40), quality of project management (30) — and you need 60 points in total and, on top of that, half of the maximum in each criterion.

With that in front of you, the diagnosis is almost automatic:

  • If you fell short on relevance, the problem is one of fit: the project didn't connect with the priorities of the action, or it wasn't clear why you were the ones doing it. It's the deepest fix — you have to rethink the project, not rewrite it.
  • If you fell short on quality of design, that's the most common case and the most fixable: it lacks concreteness. Activities without detail, phases without a timeline, learning outcomes with no clear way of measuring them.
  • If you fell short on management, that's not serious either: protocols are missing, or the division of tasks, safety and protection measures, a communication plan between partners. It's the most mechanical part.
  • If the total was fine but one criterion came up short, you don't have a bad project: you have an unbalanced project. It can be fixed in an afternoon's work on that section.

When you can file a complaint and when you can't

The Guide puts it clearly: if the applicant organisation believes that the evaluation procedure was flawed by irregularities, it can file a complaint.

The key word is procedure. It isn't an appeal against the score: it's a channel for when something in the process wasn't done as planned. Disagreeing with how a criterion was assessed isn't an irregularity, however unfair it may seem to you.

Before you go down that road, also check whether there was a request for clarification that never reached you: the Guide provides for additional information to be requested in cases of obvious clerical errors, provided the clarification doesn't substantially change the proposal.

Applying again, which is nearly always the way forward

It's the option that pays off most and the one least often chosen, because people come to the second attempt with less energy. It's worth it for one concrete reason: you have the report. On the first attempt you write blind; on the second you write with the objections in front of you, criterion by criterion.

How to do it well:

  • Put the report next to the form and respond point by point. Literally: every comment from the assessor has to have a visible change in the text.
  • Don't rewrite what scored well. It's the most common mistake: everything gets rewritten and what was working gets spoiled.
  • Check whether the next round works for you. Each round determines the dates on which the activity can start, not just the submission date. The deadlines, with their source.
  • Consider scaling down. If you lost points on operational capacity or coherence, a smaller, better-defined project scores higher than the same project with more adjectives.

What a no should change

Two things, and neither of them is the project idea.

The conversation with the board. If the application was presented as “let's see if we get lucky”, a no confirms the doubts of whoever was already sceptical. If it was presented as the first attempt of a two-year plan, a no is information. It's the same reality told in two ways, and only one of them lets you keep going.

The internal calendar. A rejected project frees up months that were already committed. It's the best moment to do the two things that always get postponed: look for partner organisations calmly and send someone from the team on a training course. Both directly improve the score of the next attempt.

Questions people ask us about this

What does being on the reserve list mean in Erasmus+?

That the project passed the quality cut but was left out for budget reasons. The final decision is based on two criteria: the ranking proposed by the evaluation committee and the budget available for the action. A project on the reserve list can get in if one of the selected ones drops out.

Can you appeal against the rejection of an Erasmus+ project?

You can file a complaint if the organisation believes the evaluation procedure was flawed by irregularities. It isn't an appeal against the score: disagreeing with how a criterion was assessed is not a procedural irregularity.

Why can a project with a good overall score be rejected?

Because there are two thresholds, not one. As well as the minimum total (60 points in most actions, 70 in KA220), you need at least half of the maximum score in each criterion separately. A project with 72 points can fail because it got 14 out of 30 in quality of project management.

Is it worth submitting the same project again?

Generally yes, because the second attempt is written with the evaluation report in front of you instead of blind. The effective way is to respond point by point to each comment, without rewriting the sections that scored well.

How do you read an Erasmus+ evaluation report?

By looking for the specific criterion where the score is low, not by reading it from top to bottom. Falling short on relevance means a problem with the project's fit; on quality of design, a lack of concreteness in activities and timeline; on management, missing protocols and division of tasks. Each one is fixed in a different way.

Get in touch

Something not covered here?

Write to us with your question. We answer it — whether we work together or not.

Email: jesus@plusers.eu · A person replies within two working days, in English, Spanish, French or Italian.